The Homabay Water Supply Project was implemented to strengthen the town’s water infrastructure through advanced electrical and mechanical installations. The works included new pumping systems, pipeline integration, and standby power to enhance efficiency and reliability of water supply operations.
The project introduced high-lift and backwash pumping sets, along with a new pipeline network and a standby generator, ensuring continuous water delivery and effective system maintenance.
Scope of Work:
1. Pumping Systems – Installation of high-lift pumping sets to enhance water transfer over long distances and elevations, and backwash pumps to maintain filter performance and water quality.
2. Pipeline Installation – Integration of new pipeline sections to expand distribution capacity and improve supply coverage.
3. Standby Power – Provision of a standby generator to guarantee uninterrupted pumping during power outages.
Key Benefits:
- Improved water delivery capacity with high-lift pumps capable of handling large volumes and elevation changes.
- Enhanced water quality through backwash systems that maintain clean and efficient filters.
- Reliable supply supported by a standby generator for operational continuity.
- Expanded coverage of the water distribution network to meet growing demand.
The Homabay Water Supply Project demonstrates a strategic upgrade of essential infrastructure, ensuring that communities benefit from reliable, safe, and sustainable access to water.